| Period |
Projects |
Pictures |
|
1 June
2008 -Now |
46 sites: Debugging,
Testing, Comissioning & ATP Speedy DSLAM project in Divre-7
Direct Customer : ZTE
Indonesia
End Customer : TELKOM
Indonesia
|
|
|
22 May
2008 - Now |
BTS Colocation (25 sites)
- Survey & Design Pack
- BTS M/E Colocation
- PLN Connection
- Material Supply
- Civil Work
Direct Customer :
PROTELINDO (Professional Telecommunication Indonesia / A
Subsidiary of PAN ASIA TOWER)
End Customer : Bakri
Telecom (BITEL),
(who lease Protelindo Telecom
Infrastructure Facility)
|
|
|
15 May
2008 - Now |
Tower Strengthening (7 sites status 29 May 2008)
- Foundation Strengthening
- Tower Strengthening
- Civil Work
Direct Customer :
PROTELINDO (Professional Telecommunication Indonesia / A
Subsidiary of PAN ASIA TOWER)
End Customer : Hutchingson (HCPT),
(who lease Protelindo Telecom
Infrastructure Facility)
|
|
|
20 May 2008 -Now |
29 sites: DWDM+SDH Installation
for RMJ Project in Divre-1
Direct Customer : ZTE
Indonesia
End Customer : TELKOM
Indonesia
|
|
|
21 April '
2008-Now |
11 sites: SDH Installation
for Telkom Ring-5 Backbone in Divre-2,3,4,5
Direct Customer : ZTE
Indonesia
End Customer : TELKOM
Indonesia
|
|
|
7 April ' 2008-Now |
15 sites: DWDM+SDH Installation
for Jember, Dempasar Submarine Cable (JDCS) in Divre-5 & 7
Direct Customer : ZTE
Indonesia
End Customer : TELKOM
Indonesia
|
|
|
March'2008-Now |
193 sites: Engineering
Speedy Survey & Design Pack for Telkom in Divre-1
Direct Customer : ZTE
Indonesia
End Customer : TELKOM
Indonesia
|
|
|
March'2008-Now |
91 sites: BTS installation,
Testing Comissioning & ATP in Central Java
Direct Customer : ZTE
Indonesia
End Customer : SMART
Telecom
|
|
|
18 March' 2008-26 March 2008 |
16 sites: DWDM Installation
in Divre-2,3,4,5
Direct Customer : ZTE
Indonesia
End Customer : TELKOM
Indonesia
|
|
|
18 Feb 2008 -
Now |
Tower Strengthening (15 sites status 29 March 2008)
- Foundation Strengthening
- Tower Strengthening
- Civil Work
Direct Customer :
PROTELINDO (Professional Telecommunication Indonesia / A
Subsidiary of PAN ASIA TOWER)
End Customer : Excelcom
(XL) & Natrindo Telecom Sellular (NTS), Hutchingson (HCPT),
Bakri Telecom (who lease Protelindo Telecom
Infrastructure Facility)
|
|
|
28 Jan'2008-14 Feb'08 |
58 sites: Engineering Survey
& Design Pack for Telkom Flexy BTS in East of Indonesia (Colocation with
Telkomsel site)
Direct Customer : ZTE
Indonesia
End Customer : TELKOM
Indonesia
|
|
|
Dec 2007 -
March 2008 |
BTS expansion capacity & Collocation (13 sites status
29 March 2008)
- Mechanical & Electrical
- Tower Strengthening
- Shelter
- Power Supply
- Material Supply
- Civil Work
Direct Customer :
PROTELINDO (Professional Telecommunication Indonesia / A
Subsidiary of PAN ASIA TOWER)
End Customer : Excelcom
(XL) & Sampurna Telekumunikasi Indonesia (STI) (who lease Protelindo Telecom
Infrastructure Facility)
|
|
|
Oct
2007-Nov 2007 |
66 sites ITC DSLAM &
MiniDSLAM for Telkom Speedy in Central Java and West Java
area
Direct Customer : ZTE
Indonesia
End Customer : TELKOM
Indonesia
|
|
|
March 2007
- Oct'2007 |
77 hops CERAGON-SMG Telecom (Wireless
Indonesia+Indoprima Mikroselindo) Microwave Link Project
o LOS+Site Survey, RFI
Survey
o SDH (1+1, 2+1 & 3+1)
Installation, Testing and Commissioning
o Supply Local
Materials:
§ Antenna Mounting,
Cable (Coax, Grounding, Power, Patch Cord, Accessories
(Feeder Clamp, Coax Clamp, Cable ties,etc) LSA, Grounding
Kit, 19" DDF Single Open Rack, Open Rack, 2/10 LSA
Disconnection Module, 0.6 X 21P X 20M PCM Cable, DB 44
Connector
Direct Customer: CERAGON
NETWORK INTERNATIONAL
End Customer : SINAR MAS GROUP
(Wireless Indonesia + Indoprima Mikroselindo) |
|
|
|
|
|
|
August'2006-Dec'2006 |
ALANDICK INDONESIA
TEKOMSEL
NETWORK (Surabaya Area) - Installation +
Pre-commissioning for Ericsson 3G Node-B BTS (9 sites)
- Installation + Pre-commissioning for Ericsson MiniLink E-TN
with Marconi (18 hops)
- Installation + Pre-commissioning for Ericsson Power Supply
System (6 sites)
- Installation + Pre-commissioning for Siemens BTS (6 sites)
TEKOMSEL
NETWORK (Kalimantan Area) - Installation +
Pre-commissioning for Ericsson 2G BTS
- Installation + Pre-commissioning for Ericsson MiniLink E-TN
INDOSAT
NETWORK (Kalimantan Area)
- Installation + Pre-commissioning for ALCATEL BTS (3
site)
|
|
|
Dec'2006-Jan'2007 |
PT. NESIC BUKAKA INDONESIA
TEKOMSEL
NETWORK
Sumatra Backbone
SDH Radio Microwave Installation, Pointing, Testing and
commissioning (10 hops).
Kalimantan Backbone
SDH Radio Microwave Installation, Pointing, Testing and
commissioning (8 hops).
|
|
|
Dec'2006-Now
Periodically |
KOPERASI KARYAWAN PT.
INDOSAT (KOPINDOSAT)
INDOSAT
NETWORK
JABODETABEK
NETWORK
- Dismantling Antenna System (15 hop)
- Swap Antenna System (2 hop)
- Dismantling BTS + Antenna System (2 sites) |
|
|
|
|
|
|
August'2005-October'2005 |
PT. NESIC BUKAKA INDONESIA
Sumatra Backbone
SDH Radio Microwave Installation, Pointing, Testing and
commissioning.
Pasolink
Radio Access Indoor
and outdoor for central Java.
Installation, Pointing, Testing and Commissioning |
|
|
Jul'2005-Nov'2006 |
EXCELCOM
Civil, Mechanical & Electrical
(Frame Contract till 2007)
Site Acquisition
(Frame Contract 2006)
Triangular steel tower
PLN Connection
Permanent and CKD Shelter
Mechanical Electrical
Site Acquisition |

|
|
Jul'2005-Dec'2005 |
TELKOMSEL/SIEMENS
Civil, Mechanical & Electrical
(Frame Contract till 2006)
Site Acquisition
(Frame Contract 2006)
Rectangular steel tower
PLN Connection
CKD Shelter
Mechanical Electrical |

|
|
|
|
|
15 Nov 2004 -
15 Jan 2005
|
Ericsson Radio MiniLink Installation Services :
1. Installation Supervision
2. Outdoor Installation
Antenna, Radio, Splitter, Radio Cable,
Earthing (Radio & Cable), Clamping radio cable
3. Indoor Installation
Radio Cable, Trx. Cab, Access Module
(Incl. MMU & SMU), Earthing, Traffic Cable with
DDF, Power Cable and distribution unit, Fan Kit
4. Alignment
5. Acceptance test by client Supervisor
Total hop: 27 hop
Customer: DAWAMIBA ENGINEERING
End Customer: INDOSAT
|
 |
8 Jul 2004
-16 Jan 2004
|
Self Supporting Tower Construction
·EXELCOM SST72M Delanggu, Central Java,
(6/7/04-10/8/04)
·EXELCOM SST72M Kedungwuni, Central Java,
70 M high (20/7/04-15/10/04)
·INDOSAT SST72M Teluk Dalam-Nias
(15/9/04-11/12/04)
·INDOSAT SST72M Sei Brombang-
North Sumatra (23/9/04-25/11/04)
·MOBILE-8 SST72M civil work Cepu-Central Java
(5/10/04-16/01/2005/stop on Cepu community
request)
·MOBILE-8 SST72M civil work Randu Blatung-
Central Java (25/10/04-16/01/05)
Customer: DAWAMIBA ENGINEERING
End Customer: EXCELKOM, INDOSAT, MOBILE-8
|
 |
5 Jan 2003 –
23 Dec 2003
|
ADSS FO Cable Survey, Design, Installation,
Testing & Commissioning
Link:
- Probolinggo – Gondang Wetan (East Java),
84 km
- Baturiti - Kapal (Bali), 46 km.
- Sanur – Pesanggaran (Bali), 8.3 km
- Probolinggo – Lumajang – Jember (East Java),
117 km
- Probolinggo – Bangil – Lumajang (East Java),
65 km
- Gilimanuk – Pemaron – Baturiti (Bali), 110 km
- Kentungan – Bantul –Purworejo – Kebumen -
Wates-Gombong
(Central Java) . 120 km
Customer : METAKOM SERVISKOMINDO
End Customer: ICON+
|
 |
5 Jan 2003-
23 Dec 2003
|
ADSS FA Cable Survey, Design, Installation,
Testing & Commissioning
Link:
·Probolinggo – Gondang Wetan (East Java).
·Sanur – Pesanggaran (Bali),
·Probolinggo – Lumajang – Jember (East Java),
·Probolinggo – Bangil – Lumajang (East Java)
·Gilimanuk – Pemaron – Baturiti (Bali)
·Kentungan – Bantul –Purworejo – Kebumen –
Wates-Gombong (Central Java)
Customer : METAKOM SERVISKOMINDO
End Customer: ICON+
|
 |
27 Aug 2003 –
16 Jan 2004
|
Power Supply for Parigi - Menado Backbone:
·Battery
·Rectifier
·UPS (Un-interrupted Power Supply System)
·Responsibility: Supply, Installation,
Testing & Commissioning
Customer : EMERSON INDONESIA/SANTIYOGA
End Customer: PT. TELKOM
|

|
8 Apr 2003-
24 Dec 2003
|
CDMA2000 1X Transmission Link (Eq: Pasolink)
for Central Java area, included:
·Survey (Path & Loss)
·Design,
·Installation (Indoor and Outdoor),
·Testing & Commissioning
Total hop: 54
Customer : NESIC BUKAKA
End Customer : MOBILE-8
|
 |
27 Aug 2003 –
6 Dec 2003
|
Supply Installation Material for
Parigi - Menado Backbone:
·LSA Frame
·LSA Terminal Block
·Feeder Rack
·PCM cable
·DC PDB
·K52 Frame
·K52 Terminal Block
·Accessories Materials
Customer : NASIO KARYA PRATAMA
End Customer: TELKOM
|
 |