Global Partner Telinfra's Project Experiences  List:
( January 2003 –  NOW)

Period Projects Pictures
1 June 2008 -Now 46 sites: Debugging, Testing, Comissioning & ATP Speedy DSLAM project in Divre-7

Direct Customer :  ZTE Indonesia

End Customer : TELKOM Indonesia

 

 
22 May 2008 - Now BTS Colocation (25 sites)
- Survey & Design Pack
- BTS M/E Colocation
- PLN Connection
- Material Supply
- Civil Work

Direct Customer :  PROTELINDO (Professional Telecommunication Indonesia / A Subsidiary of PAN ASIA TOWER)

End Customer : Bakri Telecom (BITEL), (who lease Protelindo Telecom Infrastructure Facility)

 

 
15 May 2008 - Now Tower Strengthening (7 sites status 29 May 2008)
- Foundation Strengthening
- Tower Strengthening
- Civil Work

Direct Customer :  PROTELINDO (Professional Telecommunication Indonesia / A Subsidiary of PAN ASIA TOWER)

End Customer : Hutchingson (HCPT), (who lease Protelindo Telecom Infrastructure Facility)

 

 
20 May 2008 -Now 29 sites: DWDM+SDH Installation for RMJ Project in Divre-1

Direct Customer :  ZTE Indonesia

End Customer : TELKOM Indonesia

 

 
21 April ' 2008-Now 11 sites: SDH Installation for Telkom Ring-5 Backbone in Divre-2,3,4,5

Direct Customer :  ZTE Indonesia

End Customer : TELKOM Indonesia

 

 
7 April ' 2008-Now 15 sites: DWDM+SDH Installation for Jember, Dempasar Submarine Cable (JDCS) in Divre-5 & 7

Direct Customer :  ZTE Indonesia

End Customer : TELKOM Indonesia

 

 
March'2008-Now 193 sites: Engineering Speedy Survey & Design Pack for Telkom  in Divre-1

Direct Customer :  ZTE Indonesia

End Customer : TELKOM Indonesia

 

 
March'2008-Now 91 sites: BTS installation, Testing Comissioning & ATP in Central Java

Direct Customer :  ZTE Indonesia

End Customer : SMART Telecom

 

 
18 March' 2008-26 March 2008 16 sites: DWDM Installation in Divre-2,3,4,5

Direct Customer :  ZTE Indonesia

End Customer : TELKOM Indonesia

 

 
18 Feb 2008 - Now Tower Strengthening (15 sites status 29 March 2008)
- Foundation Strengthening
- Tower Strengthening
- Civil Work

Direct Customer :  PROTELINDO (Professional Telecommunication Indonesia / A Subsidiary of PAN ASIA TOWER)

End Customer : Excelcom (XL) & Natrindo Telecom Sellular (NTS), Hutchingson (HCPT), Bakri Telecom (who lease Protelindo Telecom Infrastructure Facility)

 

 
28 Jan'2008-14 Feb'08 58 sites: Engineering Survey & Design Pack for Telkom Flexy BTS in East of Indonesia (Colocation with Telkomsel site)

Direct Customer :  ZTE Indonesia

End Customer : TELKOM Indonesia

 

 
Dec 2007 - March 2008 BTS expansion capacity & Collocation (13 sites status 29 March 2008)
- Mechanical & Electrical
- Tower Strengthening
- Shelter
- Power Supply
- Material Supply
- Civil Work

Direct Customer :  PROTELINDO (Professional Telecommunication Indonesia / A Subsidiary of PAN ASIA TOWER)

End Customer : Excelcom (XL) & Sampurna  Telekumunikasi Indonesia (STI) (who lease Protelindo Telecom Infrastructure Facility)

 

 
Oct 2007-Nov 2007 66 sites ITC DSLAM & MiniDSLAM for Telkom Speedy in Central Java and West Java area

Direct Customer :  ZTE Indonesia

End Customer : TELKOM Indonesia

 

 

March 2007 - Oct'2007

*      77 hops CERAGON-SMG Telecom (Wireless Indonesia+Indoprima Mikroselindo) Microwave Link Project

o        LOS+Site Survey, RFI Survey

o        SDH (1+1, 2+1 & 3+1) Installation, Testing and Commissioning

o        Supply Local Materials:

§         Antenna Mounting, Cable (Coax, Grounding, Power, Patch Cord, Accessories (Feeder Clamp, Coax Clamp, Cable ties,etc)    LSA, Grounding Kit, 19" DDF Single Open Rack,  Open Rack, 2/10 LSA Disconnection Module,   0.6 X 21P X 20M PCM Cable, DB 44 Connector

Direct Customer: CERAGON NETWORK INTERNATIONAL

End Customer : SINAR MAS GROUP (Wireless Indonesia + Indoprima Mikroselindo)

 

  

 

August'2006-Dec'2006 ALANDICK INDONESIA

TEKOMSEL NETWORK (Surabaya Area)
- Installation + Pre-commissioning for Ericsson 3G Node-B BTS (9 sites)
- Installation + Pre-commissioning for Ericsson MiniLink E-TN with Marconi (18 hops)
- Installation + Pre-commissioning for Ericsson Power Supply System (6 sites)
- Installation + Pre-commissioning for Siemens BTS (6 sites)

TEKOMSEL NETWORK (Kalimantan Area)
- Installation + Pre-commissioning for Ericsson 2G BTS
- Installation + Pre-commissioning for Ericsson MiniLink E-TN

INDOSAT NETWORK (Kalimantan Area)
- Installation + Pre-commissioning for ALCATEL BTS  (3 site)
 

 
Dec'2006-Jan'2007  

PT. NESIC BUKAKA INDONESIA

TEKOMSEL NETWORK

Sumatra Backbone
SDH Radio Microwave Installation, Pointing, Testing and commissioning (10 hops).

Kalimantan Backbone
SDH Radio Microwave Installation, Pointing, Testing and commissioning (8 hops).

 

 
Dec'2006-Now

Periodically

 

KOPERASI KARYAWAN PT. INDOSAT (KOPINDOSAT)

INDOSAT NETWORK

JABODETABEK NETWORK
- Dismantling Antenna System (15 hop)
- Swap Antenna System (2 hop)
- Dismantling BTS + Antenna System (2 sites)

 
August'2005-October'2005 PT. NESIC BUKAKA INDONESIA

Sumatra Backbone
SDH Radio Microwave Installation, Pointing, Testing and commissioning.

Pasolink
Radio Access Indoor and outdoor for central Java.
Installation, Pointing, Testing and Commissioning

 
Jul'2005-Nov'2006 EXCELCOM
Civil, Mechanical & Electrical
(Frame Contract till 2007)
Site Acquisition
(Frame Contract 2006)

Triangular steel tower
PLN Connection
Permanent and CKD Shelter
Mechanical Electrical
Site Acquisition



 

Jul'2005-Dec'2005
TELKOMSEL/SIEMENS
Civil, Mechanical & Electrical
(Frame Contract till 2006)
Site Acquisition
(Frame Contract 2006)

Rectangular steel tower
PLN Connection
CKD Shelter
Mechanical Electrical

15 Nov 2004 - 
15 Jan 2005

 

 
Ericsson Radio MiniLink Installation Services :
1. Installation Supervision
2. Outdoor Installation
Antenna, Radio, Splitter, Radio Cable, 
Earthing (Radio & Cable), Clamping radio cable
3. Indoor Installation
Radio Cable, Trx. Cab, Access Module 
(Incl. MMU & SMU), Earthing, Traffic Cable with 
DDF, Power Cable and distribution unit, Fan Kit
4. Alignment
5. Acceptance test by client Supervisor
 
Total hop: 27 hop

Customer: DAWAMIBA ENGINEERING
End Customer: INDOSAT

 

8 Jul 2004
-16 Jan 2004

 

Self Supporting Tower Construction
·EXELCOM SST72M Delanggu, Central Java, 
 (6/7/04-10/8/04)
·EXELCOM SST72M Kedungwuni, Central Java, 
 70 M high (20/7/04-15/10/04)
·INDOSAT SST72M Teluk Dalam-Nias 
 (15/9/04-11/12/04)
·INDOSAT SST72M Sei Brombang-
 North Sumatra  (23/9/04-25/11/04)
·MOBILE-8 SST72M civil work Cepu-Central Java 
 (5/10/04-16/01/2005/stop on Cepu community
 request)
·MOBILE-8 SST72M civil work Randu Blatung-
 Central Java (25/10/04-16/01/05)
 
Customer: DAWAMIBA ENGINEERING
End Customer: EXCELKOM, INDOSAT, MOBILE-8

 

5 Jan 2003 –
23 Dec 2003

 

ADSS FO Cable Survey, Design, Installation, 
Testing & Commissioning
Link:
- Probolinggo – Gondang Wetan (East Java),
  84 km
- Baturiti -  Kapal (Bali), 46 km.
- Sanur – Pesanggaran (Bali), 8.3 km
- Probolinggo – Lumajang – Jember (East Java),
  117 km
- Probolinggo – Bangil – Lumajang (East Java),
  65 km
- Gilimanuk – Pemaron – Baturiti (Bali), 110 km
- Kentungan – Bantul –Purworejo – Kebumen - 
  Wates-Gombong 
  (Central Java) . 120 km
 
Customer : METAKOM SERVISKOMINDO
End Customer: ICON+ 

 

5 Jan 2003-
23 Dec 2003
ADSS FA Cable Survey, Design, Installation, 
Testing & Commissioning

Link:
·Probolinggo – Gondang Wetan (East Java).
·Sanur – Pesanggaran (Bali), 
·Probolinggo – Lumajang – Jember (East Java), 
·Probolinggo – Bangil – Lumajang (East Java)
·Gilimanuk – Pemaron – Baturiti (Bali)
·Kentungan – Bantul –Purworejo – Kebumen – 
Wates-Gombong (Central Java)

Customer : METAKOM SERVISKOMINDO
End Customer: ICON+

 

27 Aug 2003 – 
16 Jan 2004

Power Supply for Parigi - Menado Backbone:
·Battery 
·Rectifier
·UPS (Un-interrupted Power Supply System)
·Responsibility: Supply, Installation, 
Testing & Commissioning

Customer : EMERSON INDONESIA/SANTIYOGA
End Customer: PT. TELKOM

8 Apr 2003-
24 Dec 2003

CDMA2000 1X Transmission Link (Eq: Pasolink) 
for Central Java area, included: 
·Survey (Path & Loss)
·Design, 
·Installation (Indoor and Outdoor), 
·Testing & Commissioning

Total hop: 54

Customer : NESIC BUKAKA
End Customer : MOBILE-8

27 Aug 2003 –
 6 Dec 2003

 


Supply Installation Material for 
Parigi - Menado Backbone:
·LSA Frame
·LSA Terminal Block
·Feeder Rack
·PCM cable
·DC PDB
·K52 Frame 
·K52 Terminal Block
·Accessories Materials
 
Customer : NASIO KARYA PRATAMA
End Customer: TELKOM

 

   

Copyright
Global Partner Telinfra

  Last updated on: Thursday, 29 May 2008 03:46:58 PM +0700